Overall equipment effectiveness
87.4%+2.8 pts vs target04 / Assembly floor
Northline operations
Window
Production line
Throughput
1,216Units · 76% of shift targetFirst-pass yield
96.8%+0.9 pts in selected windowEnergy intensity
3.7kWh / unit · below 4.0 targetSelected signal
Performance trendThroughput rose 18% across the selected 24-hour window, with one short dip during the A2 tool change.
Action queue
Open alertsPriority 02
A2 spindle vibration above watch band
Reading is 6.8 mm/s. Inspect after the current part clears.
Priority 03
B1 vision check drift
Calibration confidence fell to 93.1% on the last batch.
Priority 03
C1 material replenishment
Estimated buffer is 38 minutes at the current run rate.
Current comparison
Production lines| A1 · Frame | 348 units | 98.2% | Running |
| A2 · Frame | 326 units | 96.1% | Watch |
| B1 · Finish | 298 units | 95.7% | Setup |
| C1 · Pack | 244 units | 97.0% | Running |
Fictional sample dataset. Controls recalculate in memory; refreshing resets the dashboard.Reference shift: 06:00–14:00 · Units and events are illustrative.